By now you should be able to use the Ballast and Fresh Water Tanks as well as the Oil Tank Tables because they both require the same method to correct for List and Trim to determine a Volume of a Tank. You should also know how to do the Volume corrections for Temperature using the Tables required to determine the Volume Correction factors. I also provided all blank work form for you. Make as many copies of the forms as needed. For this project use the same Hydrostatic Data you did for the vessel with the LBP of 220 meters, however I changed the problem and I want you to use a LBP of 185 meters and the the position of the draft marks as noted with the drafts.
Please note: I have also provided the correct answers for this Project, Start and Finish. Feel free to check you work as you go, the job will show you the way. You will learn by doing!