Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak

Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak

Released Friday, 25th July 2025
Good episode? Give it some love!
Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak

Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak

Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak

Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak

Friday, 25th July 2025
Good episode? Give it some love!
Rate Episode
List

Have thoughts? Text us!

What does it take to deliver a mission-critical federal facility atop one of the most extreme environments in the U.S.? In this episode, we head to Colorado’s Pikes Peak to explore the award-winning High Altitude Research Lab, a 4,000-square-foot facility rebuilt under intense weather, logistical and design constraints. Joe Opyd shares how his team used design-build to meet the moment and what this “small” project reveals about trust, flexibility and collaboration.

Guest:
Joe Opyd, CCM, DBIA, Sr. Project Manager / Project Controls Manager, DPR Construction
Member, DBIA Federal Committee

Topics Covered:

  • Using design-build for small but complex federal projects
  • Delivering in extreme environments (wind, lightning, altitude)
  • Stakeholder collaboration and city-federal partnerships
  • Long funding timelines and design constraints
  • Safety planning and logistics at 14,000 feet
  • How DBIA principles supported project success

Related Links:

Access all our free design-build resources and learn more about Design-Build Done Right® at dbia.org.

DBIA members are shaping the future, one successful collaboration at a time.

Show More